CSE & IT Ideas & Abstracts ECE Ideas & Abstracts EEE Ideas & Abstracts EIE Ideas & Abstracts Mechanical Ideas & Abstracts Chemical Ideas & Abstracts
CIVIL Ideas & Abstracts MBA Ideas & Abstracts BIO-Tech Ideas & Abstracts BIO-Medical Ideas & Abstracts Other Projects Ideas Science Fair Projects Ideas
Custom Search

What is 1000Projects

'1000projects.com' is an educational content website dedicated to finding and realizing Final Year Projects, IEEE Projects, Engineering Projects, Science Fair Projects, Project Topics, Project Ideas, Major Projects, Mini Projects, Paper Presentations, Presentation Topics, IEEE Topics, .Net Projects, Java Projects, PHP Projects, VB Projects, SQL Projects, C & DS Projects, C++ Projects, Perl Projects, ASP Projects, Delphi Projects, HTML Projects, Cold Fusion Projects, Java Script Projects, Btech Projects, BE Projects, MCA Projects, Mtech Projects, MBA Projects, Project on Software, CBSE Projects, Testing Projects, Embedded Projects, Chemistry Projects, Electronics Projects, Electrical Projects, Science Projects, Mechanical Projects, Mba project Reports, Placement papers, Sample Resumes, Entrance Exams, Technical Faq's, Puzzles, etc

how it works?

Everything on this site is submitted by the students in this professional community. You Can submit your Projects, Project Topics & Ideas to info.1000projects{at}gmail.com after you submit your project/project Idea/Abstract/Seminar Topics, These are being verified and approved by our administrator. after approval of this project/project Idea/Abstract/Seminar Topics, It can be shown on 1000projects.com so that other users can read/discuss it.The entire content on this website is Only For Educational Purpose, Non Commercial use!

Please help us/Other Users by sending projects/project Ideas/Abstracts/Seminar Topics. Thanking You!!!!!




A REPORT ON PRACTICAL TRAINING ON STEEL PLANT
A REPORT ON PRACTICAL TRAINING ON STEEL PLANT
Ore handling plant
OBJECTIVES OF OHP: -
1. To reduces interferences of internal traffic movements and to unload raw material.
2. Blending by making homogenous pile of raw material.
3. Keeping buffer stock of raw material and their uninterrupted supply.

THE RAW MATERIAL ARE TRANSFERRED TO CONSUMERS SUCH AS: -
• Iron ore fines to SP2 & SP3.
• Iron ore to blast furnace.
• Low silicon limestone to RMP2 & SMS2.
• High silicon dolomite to SP2, SP3 & SMS2.
EQUIPMENTS
• PADDLE FEEDER
• WAGON TIPLLER
• PUSHER CAR
• STACKER
• BLENDER BARAL RECLAIMER
• TRANSFER CAR
• EXCAVATOR
• TRAVELING FEED BINS
• TRIPLER CAR
• CRANE (EOT)
• DOZER
• 3D EXCAVTOR



Blast furnace
There are 2 main section of the department:
1. Raw material section
2. Furnace section

Raw material section:
. The raw materials used for the production of pig iron are:
. Coke (fuel), Iron Ore, Sinter (Fe-bearing material), Limestone (Flux) & Mn-Ore and Quartzite (additives).
Furnace Section:
. Blast Furnace is a vertical shaft furnace, enclose in a welded shell, lined with fire-clay bricks of high alumina content.
. The walls of the furnace top are protected by steel refractory lined plates cooling the shaft,
TOP CHARGING EQUIPMENT
The bell type chaging device (exhisting in BF 1,2 & 3) has a big bell, small bell with hoppers, gas seal, and receiving hopper; and receives raw material from an oval shaped receiving hopper. In BF-3 RCU (Rotating Charging Unit) is provided, by means of which charging can be distributed in desired sector inside the furnace BFs. #4,5,6 & 7 are equipped with paul gate, upper sealing valve, lower material gate and lower sealing valve. This system also has a gearbox to operate a rotating chute. The latter distributes the material inside the furnace peripherally in different rings. This facilities better distribution of charge inside the furnace.

CHARGING PROGRAMME: -
To facilitate smooth working of furnaces, the following charging programme is normally practiced.
‘A’. Programme COC / COOCC / CCOOC
‘B’. Programme CCOO
Each charging cycle consist of 3 programmes of A & B exclusively or in combination depending on peripheral conditions. Generally in Bell-less Top Furnace the programme selected is ‘B’ i.e. CCOO, C=COKE; O=NON-COKE i.e. ore, sinter, Mn ore, lime atone or quartzite.

STOVES
Form bottom of the furnace the hot blast is blown into the furnace through tuyers with the help of turbo-blowers & hot blast stove.
Blast of Air reaches as follows:
Cold blast CB Main Stoves HB Main Bustle pipe Gooseneck pipe Tuyer stock Furnace.

FLUSHING OF SLAG: TAPPING AND DISPOSAL OF HOT METAL
. The furnace is provided with a tap hole, which is enclosed in a steel cast frame and is cooled by two Tap hole coolers, which have their own supply of water.
. The hot metal is tapped out at an interval of 1-2 hrs depending upon the furnace condition.
. The usual way of opening the tap hole is to drill the tap hole until the skull is reached. Oxygen lancing is carried out melt the skull.
. The hot metal continues to flow down the bend runner form, which it is diverted into individual metal ladles.